CaliforniaDevelopment Review

Browser-Local Execution Tool · Zero Server Storage

Cross-Monograph Project Diligence Workbench

Every diagnostic question across all 30 California Development Review monographs consolidated into one live register. Mark Confirmed or Open Issue postures, attach local evidence notes, filter by lifecycle stage, and export your project brief to Markdown, CSV, or portable JSON snapshots.

265 Diagnostic Gates30 Monographs Synced100% Local Browser Storage
Subdivision Engineering

0

Open Issues Flagged

0

Confirmed Items

0 / 30

Monographs Active

265

Total Diagnostic Gates

What development program does each operative approval actually support?

Which documents, amendments, and agency actions make up the current approval record?

What remains effective, assignable, transferable, extendable, or subject to further action?

Which conditions and mitigation measures remain open, and what evidence will clear them?

Where does the buyer plan differ from the approved project description, plans, studies, conditions, or agreements?

Which differences require professional analysis or agency confirmation?

Which utilities, access rights, easements, improvements, permits, agreements, or third-party actions control the delivery path?

Which findings should affect transaction structure, price, timing, contingencies, seller obligations, or the post-closing workplan?

What legal and physical path serves each phase for access, construction, emergency response, utilities, and maintenance?

Which provider or agency controls capacity, design, approval, construction, and activation for each system?

What evidence supports the current service or capacity assumption, and what conditions limit that evidence?

Which off-site improvements require rights on third-party property?

Which fees, agreements, security, credits, reimbursements, or district arrangements affect cost and timing?

Which approvals or letters expire before the projected delivery date?

Which interim gap or third-party dependency creates the greatest project exposure?

Which agencies, utilities, districts, agreements, conditions, maps, and permits can create a project obligation?

Which figures are estimates, imposed amounts, current calculations, secured performance, payments, or recurring burdens?

Which project version, unit count, phase, rate date, and formula support each amount?

When is each fee payable or each improvement required, and which exceptions or security arrangements apply?

Which obligations create liens, recorded contracts, title exceptions, or successor exposure?

Which items require counsel review for protest, validity, scope, timing, or preservation?

Which improvements, payments, land, or capacity create credits or reimbursement rights?

Which evidence is required to claim, transfer, collect, or audit each recovery right?

How do district taxes, assessments, utility charges, and association assessments combine at the lot or unit level?

Which obligations remain open at acquisition, financing, phase release, sale, occupancy, and closeout?

What decision, transaction, filing, or handoff must the record support?

Which properties, entities, maps, phases, products, and periods are included?

What document is operative for each material issue?

Has the source been issued, adopted, approved, accepted, executed, or recorded?

What earlier version does it supersede?

Which facts, rights, obligations, costs, and decisions depend on it?

Is the copy complete, signed, recorded, certified, and accompanied by all exhibits?

What evidence remains missing or unverified?

Which public repository, agency file, title source, professional, or project custodian can supply it?

What assumption is being used until the gap is resolved?

Who may access, edit, share, or rely on each document class?

Which milestone requires an immutable snapshot?

What must transfer to the next owner, builder, lender, association, operator, or internal team?

Has every operative resolution, ordinance second reading, map approval, and CEQA action been separated with its exact decision date?

Was a compliant Notice of Determination or Notice of Exemption filed and posted with both the county clerk and State Clearinghouse (CEQAnet) after project approval?

Do stamped clerk certificates confirm that the NOD or NOE remained posted for the full statutory period and carried a valid CDFW receipt or exemption?

If any approval lacked a valid NOD or NOE, has the full 180-day Public Resources Code section 21167(a)/(d) period run?

Have 90 calendar days elapsed since every Subdivision Map Act and Government Code section 65009 decision, with clerk confirmation of zero summons service?

Did the seller, applicant, or local agency enter into any written tolling agreement extending a CEQA, Map Act, or zoning limitations window?

Were all local administrative appeal periods from advisory bodies or planning commissions exhausted or closed without appeal?

Did the agency deliver a compliant Government Code section 66020(d)(1) written fee-imposition notice, and was any 90-day protest preserved?

What development outcome and decision criteria should guide the mapping alternatives?

Which boundaries, interests, easements, and shared components require early technical and legal evaluation?

Which access, utility, drainage, grading, infrastructure, or service assumptions could alter the lotting or phasing concept?

Which map features affect the project description or technical studies?

Which agency discussions should occur before the concept advances?

Which conditions or implementation dependencies could affect feasibility, financing, public-report timing, or delivery?

Which project decisions should remain flexible through the next review gate?

Which local ordinance and application procedure govern the vesting filing?

What date and evidence establish application completeness?

Which ordinances, policies, and standards were operative at that time?

Which initiated and noticed changes or applicant-requested changes affect the baseline?

What development program and physical plan are covered by the approved map?

Which later approvals remain discretionary, and which conditions may be imposed under the vested rules?

Which health-and-safety, state-law, federal-law, utility, or environmental issues require separate review?

When does the vesting tentative map expire, and when must the final map be approved?

What post-recordation period applies to each final-map phase?

Which complete applications and permit dates support continuity?

Does a proposed change require an amendment, departure, new approval, environmental review, or revised public-report strategy?

What evidence will a buyer, lender, agency, or successor team need to evaluate the reliance position?

What map type and statutory provision govern the project?

Which date constitutes approval or conditional approval for the calculation?

Does a local ordinance add time, and which version applies?

How much discretionary-extension capacity has already been used?

What local filing, hearing, and appeal procedures govern an extension request?

Does a moratorium, litigation stay, development agreement, special statute, or phased-final-map mechanism affect the clock?

What final-map package must reach which official by the internal and statutory filing dates?

Which title, improvement, security, property-rights, agency, or execution issue controls the final-map schedule?

Does the map remain unexpired through December 31, 2026 so that enacted Senate Bill 1169 (Stats. 2026, ch. 423, effective January 1, 2027) applies?

Which approved tentative map, revisions, conditions, and expiration rules control the filing?

Does the project anticipate one final map or several final maps, and has the sequence been confirmed with the agency?

Which title interests, signatures, dedications, easements, or related documents affect recordation?

Which public improvements remain incomplete at map approval, and what agreements and security apply?

Which off-site improvements depend on property rights outside the subdivider’s control?

Which local clearances, fees, tax materials, certificates, and approvals drive the final sequence?

Which obligations continue after the map records, and who receives them?

Does the site satisfy every statutory zoning, acreage, urban-location, hazard/coastal, and protected-housing exclusion criterion under Government Code section 66499.41 or 66411.7?

Do proposed unit count (10 or fewer), minimum density, and average net habitable floor area (1,750 sq. ft. cap under § 66499.41) match the current operative 2026–2027 statutory text?

If the project is mixed-use with five or more parcels, does AB 1834 (Gov. Code § 66426(a)(3), eff. Jan. 1, 2027) allow parcel-map processing based on approved public-street access and street alignments?

Will the project create five or more residential lots or units, shared driveways, common stormwater facilities, or an HOA that triggers a mandatory DRE Public Report (RE 624 / RE 628)?

If 5–19 units are structured as a single-phase common-interest community, should counsel evaluate an incorporated HOA versus an unincorporated association (RE 616A)?

How will reciprocal access, joint-trench utility, and shared-drainage easements be plotted and subordinated before vertical permits or closings?

If invoking early building permits before final-map recordation under Government Code section 65852.28, what grading/improvement security and construction-lender title endorsements are required?

Has the submittal package been cross-checked item-by-item against objective local standards so the 60-day ministerial review clock runs cleanly?

Which approvals and application stages are included in the current submission?

Does the project qualify for and use the housing preliminary-application procedure in Government Code section 65941.1?

Which local checklist version governs the full application?

Which project facts remain assumptions, and who has authority to confirm them?

Do all forms, plans, studies, narratives, and fee inputs use the same development program and physical plan?

Which technical studies depend on another consultant’s conclusion or an agency decision?

Which completeness comments require a project decision, professional judgment, legal review, or agency clarification?

What evidence establishes each filing and resubmittal date?

Which changes after filing require review across the complete project record?

Which document currently controls the project definition?

Which project facts remain working assumptions, and who owns the decision on each?

Which technical studies rely on the assumptions most likely to change?

Which agency comments affect more than one application, plan, study, or phase?

Which upcoming milestone creates a practical decision deadline?

Which changes require professional analysis, agency confirmation, or sponsor direction?

Which conditions and mitigation measures should enter implementation planning now?

What evidence will establish closure for each open issue?

Which project-description and plan versions does each study analyze?

What decision, environmental-document section, permit, or design choice will use the study?

What baseline period and evidence support the existing-condition analysis?

Which methods, models, protocols, thresholds, and software versions apply?

Which inputs come from another discipline, and who confirms them?

Which findings depend on stated assumptions or limited data?

What project-design features, mitigation measures, or conditions arise from the study?

What project, environmental, regulatory, or data change triggers review?

Which study outputs must reach design, construction, compliance, and operations teams?

Where are the raw data, calculations, model files, field records, and final approval evidence stored?

What documents constitute the operative development agreement today?

Which parcels, phases, and entities are subject to it?

When did the agreement become effective, when does it expire, and what extension procedures apply?

Which rules are fixed, incorporated, modified, or left to later agency action?

What public benefits, improvements, dedications, payments, fees, credits, reimbursements, and security obligations remain open?

Which subsequent approvals are required, and what agreement provisions govern them?

What must the applicant or successor submit for the next annual review?

Which compliance items lack agency acceptance or documentary evidence?

Does a proposed project change require an amendment, administrative interpretation, waiver, associated entitlement change, or further environmental review?

What consent, assumption, security, and recordation steps apply to a transfer?

Which obligations survive completion, transfer, or expiration?

Does residential square footage equal at least two-thirds of total building floor area (or higher mixed-use thresholds where required) so the project qualifies under the Housing Accountability Act and SB 330?

Are the 180-day full-application deadline and any 90-day incompleteness cure deadline tracked on the critical path from the SB 330 preliminary application date?

Have architectural massing tables separated base maximum density (using the highest allowable general-plan/zoning range), fractional round-ups (§ 65915(q)), concessions (§ 65915(d)), and physical-preclusion waivers (§ 65915(e))?

Did the local agency issue any written HAA objective-inconsistency notice within the strict 30-day (<=150 units) or 60-day (>150 units) window of Gov. Code § 65589.5(j)(2)?

Does the site qualify for the <=20-acre urban infill housing CEQA exemption under Public Resources Code section 21080.66 (including Phase I ESA, tribal process, and exclusion checks) or ministerial streamlining under section 65913.4?

Have all workshops, design-review sessions, planning commission meetings, continuances, and appeals been counted against the 5-hearing limit in Gov. Code § 65905.5?

If deed-restricted affordable for-sale units are included in a common-interest development, do the HOA budget and CC&Rs incorporate Civil Code section 5605(c)(1) (AB 572) assessment-increase caps?

Have 2027 statutory amendments to Density Bonus (§ 65915 — SB 1383, AB 2433, AB 2480) and SB 423 (§ 65913.4 — AB 2390) been evaluated by land-use counsel?

Have all adopted conditions, mitigation measures, design commitments, agreements, and referenced requirements been captured?

Which obligations contain several independently trackable actions?

Which terms require legal, technical, or agency interpretation?

Which obligations affect final mapping, permits, public reports, budgets, disclosures, sales, occupancy, or phase delivery?

What evidence will demonstrate completion, and who accepts that evidence?

Which obligations continue after approval, recordation, construction, closing, or turnover?

Which open action carries the greatest cost, schedule, or redesign exposure?

Which approved fact, plan, condition, mitigation measure, agreement, or representation would change?

Which agency or professional determines the applicable review path?

Which technical studies and source assumptions require revision?

Which map, permit, public report, governing document, budget, disclosure, or operating plan carries the current assumption?

Which project milestone depends on the decision?

What evidence and approvals are required before implementation?

Which fallback path preserves the project’s critical objective?

What property interests and shared components will exist at each phase?

Who owns, uses, accesses, operates, maintains, repairs, replaces, insures, and funds each component?

Which relationships require easements, reciprocal agreements, cost-sharing, or separate governance?

Which facilities serve a limited benefit group or more than one phase, association, or project component?

Which operating and reserve assumptions depend on current design quantities or timing?

What happens at first closing, first occupancy, facility opening, later annexation, and transition of control?

Which documents, budgets, plans, disclosures, and filings rely on each unresolved decision?

What evidence will establish that each phase or responsibility transition has occurred?

Which facilities are shared across phases, associations, owners, or users?

Who owns each facility today, and who will own it after conveyance?

What easements, licenses, and access rights support use, maintenance, repair, and emergency entry?

Who operates, inspects, maintains, repairs, and replaces each component?

How are operating costs, reserves, insurance, utilities, emergencies, and capital improvements allocated?

Which entity includes the facility in its budget and reserve study?

What completion, security, inspection, warranty, conveyance, and acceptance steps remain?

How do early phases use and fund facilities before later phases enter?

What happens to allocation, governance, capacity, and subsidies as phases are annexed?

Do declarations, agreements, maps, budgets, DRE filings, public reports, and sales materials describe the same arrangement?

What information must transfer to the association at turnover?

Does every grading, demolition, and building permit transmittal explicitly state that it is an application for a post-entitlement phase permit under Government Code section 65913.3?

Are the 15-business-day completeness window and 30- or 60-business-day plan-check review clocks tracked separately for each permit package?

Has every pre-permit fee invoice been audited against Government Code section 66007 deferral rules and SB 1036 (§§ 66001(h), 66013(j)) existing-use offsets?

Are electric/gas utility load letters, joint-trench designs, Rule 15/16 contracts, and transformer/switchgear procurement lead times tied to the vertical schedule?

Do Vesting Tentative Map projects track plan-check processing days exceeding 30 days under Government Code section 66498.5(c) so post-recordation vesting extensions are documented?

Have draft CC&Rs and architectural guidelines removed prohibitions or unreasonable restrictions on heat pumps (§ 4737), cooling (§ 4738), Energy Code windows (§ 4754), EV chargers (§ 4745), and PD ADUs (§ 4751)?

Do common-area landscape plans and DRE HOA water budgets eliminate potable irrigation of nonfunctional turf under Water Code section 10608.14 (SB 1139)?

Are pre-building-permit MMRP and condition clearances packaged and signed off ahead of the 30/60-business-day plan-check target?

Which facilities, services, and obligations exist in each phase state?

Who owns, maintains, repairs, replaces, insures, and pays for each item?

Which plans, documents, agreements, consultant reports, and field conditions establish the inventory?

Which costs are supported by current contracts, proposals, tariffs, policies, or professional estimates?

Which values remain allowances, and what event will verify them?

Which components require reserve funding, and when does each component enter service?

How are costs allocated among master, subassociation, phase, use, and ownership classes?

What assessment treatment applies to developer-owned interests?

Which subsidies, guarantees, contributions, or temporary arrangements support the budget?

How does each new phase change owner count, facilities, services, reserves, and assessment allocation?

Which budget version supports the current public report, association year, and phase-release decision?

Do all maps, plans, documents, budgets, filings, and schedules describe the same phase?

Which facilities and systems will be complete, secured, available, or temporary at first closing?

Which entity owns, uses, maintains, repairs, replaces, and pays for each component during every transition period?

Which recorded instruments and DRE actions support the offering and closing sequence?

Which budget, subsidy, assessment, reserve, and start-up assumptions depend on future phases?

Which operational systems must be active on day one?

Which future-phase changes would trigger review of current documents, budgets, disclosures, facilities, or filings?

Which project facts remain subject to sponsor direction?

Which filing assumptions require confirmation from counsel, DRE, or another responsible professional?

Which documents currently rely on different unit counts, phases, boundaries, facilities, or completion dates?

Which budget and reserve assumptions depend on plans that remain in design?

Which improvements or disclosures require additional evidence, security, execution, or agency action?

Which anticipated project changes would trigger an amendment, renewal, document revision, or broader consistency review?

Does every row state one discrete requirement and the source behind it?

Can a reviewer reach the current evidence directly from the matrix?

Are the preparation lead, contributing professionals, and sponsor decision owner identified separately?

Does each blocked item state the exact dependency, next action, owner, and date?

Do agency comments link to the documents and project facts affected by the response?

Are submission packages preserved by exact version?

Does “closed” carry agency, professional, execution, or decision evidence appropriate to the item?

Are changed assumptions routed into all dependent documents, budgets, disclosures, and phases?

Is the project eligible to use a pre-approved DRE Form RE 616 Master Management Document, or do multi-phase conversion, 500+ unit master-plan, or mixed-use exclusions require direct RE 648 review?

Has every page and paragraph reference on the 15-page DRE Form RE 648 check sheet been verified against the final paginated CC&Rs, Bylaws, Articles, and Annexation Declaration?

Do member-discipline provisions combine 10 CCR § 2792.26’s 15-day pre-hearing notice floor with AB 130’s $100 standard fine cap, pre-meeting cure safe harbor, and 14-day post-hearing notice?

Are general member quorums (>=25% per 10 CCR § 2792.17), director-election 20% reconvened quorums (Civ. Code § 5115(d)(2)), and >50% § 5605 assessment quorums kept strictly distinct?

Does Class B voting conversion match single-phase (75% / 2nd anniversary) versus multi-phase (2nd anniversary latest phase / 4th anniversary Phase 1) rules under 10 CCR § 2792.18?

Do Bylaws and management contracts incorporate AB 739’s annual managing-agent fee statement review (Civ. Code §§ 5200, 5500, eff. Jan. 1, 2027) and Open Meeting Act consent limits?

Where deed-restricted affordable units are included, do CC&Rs and RE 623 budgets reconcile 10 CCR § 2792.16 assessment rules with Civil Code § 5605(c)(1) (AB 572) regular-assessment caps?

Have mandatory 10 CCR § 2792.4 completion-bond enforcement clauses and 10 CCR § 2792.27(b)(4) 1-year pre-sale rental reserve covenants been verified?

Has each DRE comment been preserved verbatim and divided into clear internal actions where needed?

Which comments share one underlying project question?

Which source document and professional own the controlling fact?

Which sponsor decisions must precede document revision?

Which other filings, phases, budgets, governing materials, disclosures, or completion arrangements rely on the same answer?

What constitutes a complete response package?

What evidence supports closure for the current review cycle?

Which public report currently authorizes the offering, and when does it expire?

Which unsold interests and phases are covered?

What changed, when did it change, and which evidence establishes the current fact?

Does the change affect sold interests, association operations, future phases, or existing purchaser commitments?

Which Regulation 2800 categories and current DRE form instructions apply?

Does the complete change set qualify for an expedited route?

Which documents, budgets, security arrangements, disclosures, sales instruments, and field materials require revision?

What offering controls apply while DRE review is pending?

What exact agency action authorizes field use?

How will every superseded copy be removed from active circulation?

Which DRE report covers each lot or unit today?

What activity does the current report authorize?

When does the report expire, and what internal stop date applies?

Which reservation instrument, contract, disclosure package, and escrow instructions are approved for that report?

How are reservation deposits held, reconciled, refunded, and converted?

Has each purchaser received the correct report before the relevant agreement?

Are signed receipts complete, timestamped, retained, and accessible for review?

What conditions prevent escrow closing, funds release, or conveyance?

Do marketing claims match the current project record and report?

Has any project, title, budget, facility, phasing, hazard, or offering change triggered DRE review?

Which buyers, contracts, escrows, and closings are affected by an amendment or renewal?

Who has authority to release and suspend field activity?

Which event begins each governance, election, assessment, disclosure, delivery, warranty, and phase clock?

Which governing documents and regulations control the board composition and voting structure at each stage?

Which corporate, financial, membership, meeting, and DRE records are complete and current?

Which funds, assessments, subsidies, advances, reserves, reimbursements, or shared costs require reconciliation?

Which contracts, policies, utilities, systems, permits, and credentials support ongoing operations?

Which facilities are completed, operational, conveyed, secured, under warranty, or subject to open items?

Which plans, manuals, approvals, test records, warranties, and maintenance schedules have been delivered?

Which Regulation 2792.23 items remain pending or will be obtained later?

Which future phases, developer rights, access needs, cost centers, and completion obligations continue?

What has the association acknowledged receiving, and which exceptions remain open?

Is the project new residential construction governed by Title 7 (Civil Code §§ 895–945.5) or an existing-building condominium conversion excluded under section 896 and governed by Civil Code section 1134?

Have Title 7 Chapter 4 notices been recorded on title, included in purchase contracts, and backed by an active Secretary of State or third-party agent-for-notice registration (§ 912)?

Are valid Notices of Completion recorded and archived with exact dates per building or phase to anchor statutory limitation clocks (§ 941) and DRE bond-enforcement windows (10 CCR § 2792.4)?

Have buyer and HOA maintenance manuals, manufacturer warranties, and preventive-maintenance schedules been delivered with itemized signed receipts (§§ 907, 912)?

Do any optional subdivider-HOA ADR clauses in CC&Rs comply strictly with 10 CCR § 2791.8 (including subdivider advancement of initial fees and 60-day neutral appointment) while harmonizing with Civil Code § 6000?

For condominium buildings with wood-supported exterior elevated elements >6 ft above grade, are as-built waterproofing drawings and the 6-year post-CO initial inspection milestone (§ 5551) included in the HOA reserve study and turnover binder?

Does the turnover archive preserve every building plan, soil report, engineering calculation, and specification required to be produced within 30 days of a Title 7 or Calderon request?

Have OCIP/wrap insurance tails, subcontractor indemnity/additional-insured certificates, and warranty-service intake contacts been reconciled prior to first closing and board turnover?