Skip to main content
CaliforniaDevelopment Review

2026 Chaptered California Legislation · 1,263 Bills Audited

January 1, 2027 Statutory Watch & Master Clocks Atlas

Every chaptered California statutory package reshaping subdivision maps, Mitigation Fee Act offsets, ministerial 10-lot starter-home subdivisions, State Density Bonus, urban infill CEQA exemptions, post-entitlement permit clocks, and Davis-Stirling CID governance—paired with a 28-clock statutory deadlines observatory.

18 Enacted Statutory Packages28 Statutory Clocks & BarsAudited 2026-11-25
Statutory & Map Plates

Showing 18 of 18 verified 2025–2027 California statutory transition packages

SB 1169 — Gov. Code § 66452.6(a)(1)

Stats. 2026, ch. 423 · Government Code · Subdivision & Mapping

Effective Jan. 1, 2027

Prior Baseline Rule

24-month initial statutory tentative-map term plus up to 24 additional months by local ordinance (per SB 9, Stats. 2021, ch. 162).

Operative Statutory Change

Sets a 48-month initial statutory tentative-map term plus up to 36 additional months by local ordinance, statewide (including charter cities), for any approved or conditionally approved tentative map not expired as of December 31, 2026.

Development Execution Implication

Maps facing expiration on or before December 31, 2026 require timely extension or final-map filing under 2026 rules to survive into 2027; parcel maps under § 66463.5 retain 24-month base and 12-month local terms.

SB 1036 — Gov. Code §§ 66001(h), 66013(j)

Stats. 2026, ch. 54 · Government Code · Feasibility & Due Diligence

Effective Jan. 1, 2027

Prior Baseline Rule

Mitigation Fee Act reasonable-relationship findings without a codified uniform existing-use offset subsection across impact fees and capacity charges.

Operative Statutory Change

Requires local development fees under § 66001 on projects demolishing or changing an existing use—including changes of use within an existing structure without demolition—to be offset to incremental impact, and limits § 66013 water/sewer capacity changes to incremental capacity.

Development Execution Implication

Infill, redevelopment, and adaptive-reuse underwriting should document prior permitted use, square footage, and meter capacity before demolition; excess prior capacity/impact is nonrefundable and does not cross-offset other fees.

AB 1834 — Gov. Code § 66426(a)(3)

Stats. 2026, ch. 43 · Government Code · Subdivision & Mapping

Effective Jan. 1, 2027

Prior Baseline Rule

Parcel-map exception for 5+ parcel divisions under § 66426(a)(3) limited to land zoned for industrial or commercial development.

Operative Statutory Change

Extends the § 66426(a)(3) parcel-map exception to tracts zoned for mixed-use development—expressly inclusive of residential uses—that have approved public-street access and governing-body street-alignment approval.

Development Execution Implication

Mixed-use subdivision strategies should evaluate early whether parcel-map processing applies locally while separately screening DRE Public Report requirements for 5+ residential units.

SB 677 — Gov. Code §§ 66452.5, 66452.8, 66458, 66462

Stats. 2026, ch. 974 · Government Code · Subdivision & Mapping

Effective Jan. 1, 2027

Prior Baseline Rule

Final-map conformity approval and improvement-agreement appeal rules under §§ 66458(d) and 66462(d) without § 66452.8 coordination.

Operative Statutory Change

Preserves ministerial final-map conformity approval and improvement-security requirements while coordinating local legislative-body appeal provisions in §§ 66458(d) and 66462(d) with new Government Code § 66452.8.

Development Execution Implication

Final-map charters and local-clearance schedules on qualifying housing developments should verify delegated approval and appeal procedures with counsel and city/county engineering.

SB 1090 / SB 1116 / AB 2601 — Gov. Code §§ 65852.28, 66499.41

Stats. 2026, chs. 1006, 808 & 955 · Government Code · Subdivision & Mapping

Sept. 30, 2026 / Jan. 1, 2027

Prior Baseline Rule

SB 684 / SB 1123 60-day ministerial 10-parcel starter-home subdivision rules prior to 2026 chaptered harmonizing amendments.

Operative Statutory Change

Refines objective-standard limits, remainder-parcel mechanics, and dual-version operative transitions (Sept. 30, 2026 urgency and Jan. 1, 2027 operative text) for <=10-lot ministerial starter-home maps and pre-final-map building permits.

Development Execution Implication

Small-lot infill townhome and detached starter-home sponsors should verify the exact post-Jan. 1, 2027 section 66499.41 text and open parallel DRE filings whenever 5–10 residential units are offered.

AB 130 / SB 158 — PRC § 21080.66 · Gov. Code §§ 65905.5, 65941.1, 65943, 65950(a)(7) · Civ. Code §§ 5850, 5855

Stats. 2025, chs. 22 & 650 · Public Resources Code · Entitlements & CEQA

In Operation (2025–2027)

Prior Baseline Rule

No statutory <=20-acre urban infill housing CEQA exemption paired with a 30-day PSA approval clock, and no $100 statutory ceiling on standard HOA disciplinary fines.

Operative Statutory Change

Exempts qualifying <=20-acre urban housing developments (<=4 acres for Builder’s Remedy) from CEQA upon tribal, Phase I ESA, and site-exclusion compliance, sets a 30-day § 65950(a)(7) approval clock, and caps standard HOA fines at $100 with pre-hearing cure rights.

Development Execution Implication

Screen urban housing sites for PRC § 21080.66 + 30-day PSA acceleration, and reconcile AB 130 HOA fine/cure rules with 10 CCR § 2792.26’s 15-day notice floor in new CC&Rs.

SB 1383 / AB 2433 / AB 2480 — Gov. Code § 65915

Stats. 2026, chs. 1032, 800 & 801 · Government Code · Entitlements & CEQA

Effective Jan. 1, 2027

Prior Baseline Rule

State Density Bonus Law prior to 2026 chaptered refinements on concessions/incentives, student housing, and calculation alignment.

Operative Statutory Change

Amends Government Code § 65915 across three coordinated 2026 enactments governing Density Bonus incentives/concessions, student-housing bedspace eligibility, and statutory density-bonus administration.

Development Execution Implication

Density-bonus massing studies and application narratives filed for 2027 review should verify concession documentation, § 65915(q) component round-ups, and § 65915(p) transit parking caps.

AB 2390 — Gov. Code § 65913.4

Stats. 2026, ch. 799 · Government Code · Entitlements & CEQA

Effective Jan. 1, 2027

Prior Baseline Rule

SB 35 / SB 423 streamlined ministerial multifamily approval process prior to 2026 review and post-approval modification refinements.

Operative Statutory Change

Updates objective-standard consistency review and project-modification mechanics for multifamily developments streamlined under Government Code § 65913.4 (in effect through January 1, 2036).

Development Execution Implication

Sponsors pursuing ministerial multifamily approvals or post-approval refinements under § 65913.4 should align modification submittals with the 2027 statutory text.

AB 1621 / SB 1072 — Gov. Code §§ 65589.5, 65913.3, 66300

Stats. 2026, chs. 780 & 322 · Government Code · Entitlements & CEQA

Effective Jan. 1, 2027

Prior Baseline Rule

Post-entitlement phase permit shot clocks (§ 65913.3) and Housing Accountability Act (§ 65589.5) prior to 2026 enforcement alignments.

Operative Statutory Change

Strengthens alignment between post-entitlement building/grading/demolition permit review time limits (15-business-day intake; 30/60-business-day plan check) and Housing Accountability Act protections.

Development Execution Implication

Label every grading, demolition, and building permit application explicitly as a post-entitlement phase permit and track business-day shot clocks on the delivery dashboard.

SB 499 — Gov. Code § 66007

Stats. 2025, ch. 543 · Government Code · Feasibility & Due Diligence

In Operation (Eff. Jan. 1, 2026)

Prior Baseline Rule

Residential public-improvement fee deferral statute with prior ambiguity over application-stage utility connection service charges.

Operative Statutory Change

Maintains deferral of residential public-improvement fees to final inspection or certificate of occupancy (and >=49% lower-income protections against early collection) while clarifying actual-cost utility connection charges at service application.

Development Execution Implication

Audit pre-building-permit fee invoices line-by-line to separate deferrable public-improvement impact fees from actual-cost utility connection charges.

AB 1892 — Civ. Code §§ 4775, 5103, 5105

Stats. 2026, ch. 169 · Civil Code · Common Interest Development

Effective Jan. 1, 2027

Prior Baseline Rule

Common-area maintenance and utility-interruption repair provisions under § 4775 and HOA election/acclamation rules prior to 2026 clarifications.

Operative Statutory Change

Refines association repair responsibility and 14-day repair-initiation duties when gas, heat, water, or electrical service to a separate interest is interrupted due to a failure beginning in the common area, and updates §§ 5103/5105 election rules.

Development Execution Implication

CC&Rs, condominium plans, Bylaws election clauses, and shared-facility matrices must define utility-line ownership, access easements, and emergency repair duties cleanly.

AB 2050 — Civ. Code §§ 5550, 5552

Stats. 2026, ch. 796 · Civil Code · Common Interest Development

Jan. 1, 2027 / Jan. 1, 2032

Prior Baseline Rule

Triennial reserve visual inspection scope under Civ. Code § 5550 without explicit utility-line inclusion or a statutory 30-year non-negative minimum reserve-funding floor.

Operative Statutory Change

Adds common-area utility lines to the § 5550 reserve-study scope beginning January 1, 2027, and enacts § 5552 establishing 30-year non-negative reserve-balance minimum funding rules operative January 1, 2032.

Development Execution Implication

DRE budget packages (RE 623 / RE 624 / RE 635), initial reserve studies, and multi-phase annexation funding schedules should align component inventories and long-horizon funding assumptions early.

AB 739 — Civ. Code §§ 5200, 5500

Stats. 2026, ch. 506 · Civil Code · Common Interest Development

Effective Jan. 1, 2027

Prior Baseline Rule

Monthly board financial review under § 5500 without an explicit annual managing-agent fee statement mandate in § 5200 association records.

Operative Statutory Change

Requires the HOA board to review an annual statement of fees charged by the managing agent under § 5500 and classifies that statement as an inspectable association record under § 5200.

Development Execution Implication

Update draft CID Bylaws financial-review sections and initial HOA management agreements prior to 2027 DRE submissions and association activation.

AB 2035 — Civ. Code § 4275

Stats. 2026, ch. 916 · Civil Code · Common Interest Development

Effective Jan. 1, 2027

Prior Baseline Rule

Superior court CC&R amendment petitions under Civ. Code § 4275 required affirmative votes from more than 50% of members.

Operative Statutory Change

Permits judicial amendment petitions with more than 37% affirmative member votes for qualifying senior citizen housing developments meeting specified statutory criteria and amendment-lookback limits.

Development Execution Implication

Account for the revised § 4275 judicial petition threshold when structuring or advising age-restricted (55+) senior common-interest developments.

AB 2692 — Civ. Code § 4276

Stats. 2026, ch. 124 (Urgency) · Civil Code · Common Interest Development

Los Angeles County (Sunset 2028)Urgency Aug. 24, 2026 (LA County)

Prior Baseline Rule

Declarations terminated by expiration of their initial term lacked a dedicated statutory member-vote reinstatement section.

Operative Statutory Change

Adds Civil Code § 4276—applicable exclusively within the County of Los Angeles (§ 4276(f)) and repealed January 1, 2028 (§ 4276(g))—allowing member-vote reinstatement and recording of expired declarations for up to the initial term or 20 years, whichever is less.

Development Execution Implication

On Los Angeles County redevelopment or older-CID diligence before Jan. 1, 2028, verify whether an expired legacy declaration was or may be reinstated under § 4276.

SB 222 / AB 1684 / SB 908 — Civ. Code §§ 4737, 4738, 4754

Stats. 2026, chs. 738, 887 & 787 · Civil Code · Common Interest Development

Effective Jan. 1, 2027

Prior Baseline Rule

CID architectural rules lacked standalone statutory protections for heat-pump HVAC/water heaters, separate-interest cooling systems, and Energy Code window replacements.

Operative Statutory Change

Voids or restricts CID governing-document provisions that effectively prohibit or unreasonably restrict residential heat-pump HVAC/water heaters (§ 4737), cooling systems (§ 4738), or California Energy Code-compliant window replacements (§ 4754).

Development Execution Implication

Purge conflicting architectural bans, excessive review fees, or efficiency-reducing aesthetic rules from draft CC&Rs and design guidelines prior to DRE submission.

SB 1267 / AB 956 — Civ. Code §§ 714.3, 4745, 4751 · Gov. Code § 66323

Stats. 2026, chs. 350 & 791 · Civil Code · Common Interest Development

Effective Jan. 1, 2027

Prior Baseline Rule

Prior EV-charging covenant statute (§ 4745) and planned-development ADU/JADU protections (§ 4751) before 2026 liability and ministerial-alignment amendments.

Operative Statutory Change

Clarifies civil liability protections for compliant associations on owner EV charging stations (§ 4745) and updates ADU/JADU covenant restrictions and ministerial approval alignments in planned developments (§§ 714.3, 4751; Gov. Code § 66323).

Development Execution Implication

Align EV-charging covenants, insurance clauses, and planned-development ADU/JADU provisions in new CC&Rs before DRE review.

SB 1139 — Wat. Code § 10608.14

Stats. 2026, ch. 88 · Water Code · Common Interest Development

Effective Jan. 1, 2027

Prior Baseline Rule

AB 1572 phased prohibition on potable-water irrigation of nonfunctional turf prior to 2026 local enforcement and civil-liability refinements.

Operative Statutory Change

Refines civil-penalty and local-enforcement mechanics under Water Code § 10608.14 governing potable-water irrigation of nonfunctional turf on commercial, industrial, institutional, and HOA common-area properties.

Development Execution Implication

Coordinate landscape architecture planting palettes, recycled-water or drip irrigation plans, and DRE RE 623 water budgets to eliminate potable irrigation of nonfunctional turf.

28 Statutory Deadlines, Shot Clocks & Judicial Bars

Master California Development Statutory Clocks Atlas

Filter every statutory completeness deadline, Permit Streamlining Act decision ceiling, CEQA and Subdivision Map Act judicial limitations bar, tentative-map and VTM clock, post-entitlement building-permit shot clock, and DRE / CID turnover window—distinguishing calendar days from California business days.

Clock #01 · Entitlement & Streamlining30 Business Days (Business Days)

SB 330 Itemized Fee & Exaction Schedule

Gov. Code § 65941.1(b)(1) · Trigger: Submittal of complete SB 330 preliminary application

Locks vesting date to preliminary submittal while obligating local agency to provide itemized fee/exaction list.

Clock #02 · Entitlement & Streamlining180 Calendar Days (Calendar Days)

SB 330 Full Development Application Submittal

Gov. Code § 65941.1(e)(1) · Trigger: Submittal of complete SB 330 preliminary application

Missing the 180-day full-submittal deadline forfeits preliminary-application ordinance and fee vesting.

Clock #03 · Entitlement & Streamlining90 Calendar Days (Calendar Days)

SB 330 Incompleteness Cure Window

Gov. Code § 65941.1(e)(2) · Trigger: Written agency incompleteness determination on post-SB 330 full application

Failure to submit the requested items within 90 calendar days causes the SB 330 vesting shield to expire.

Clock #04 · Entitlement & Streamlining30 Calendar Days (Calendar Days)

Permit Streamlining Act Completeness Review

Gov. Code § 65943(a) · Trigger: Receipt of development project application (or resubmittal)

Deemed complete by operation of law if agency fails to transmit written completeness determination linked to published submittal checklist.

Clock #05 · Entitlement & Streamlining30 Calendar Days (Calendar Days)

HAA Objective-Standard Inconsistency Notice (<=150 Units)

Gov. Code § 65589.5(j)(2)(A)(i) · Trigger: Housing development application (<=150 units) deemed complete

Project is deemed consistent with objective standards by operation of law if timely written explanation is not issued.

Clock #06 · Entitlement & Streamlining60 Calendar Days (Calendar Days)

HAA Objective-Standard Inconsistency Notice (>150 Units)

Gov. Code § 65589.5(j)(2)(A)(ii) · Trigger: Housing development application (>150 units) deemed complete

Project is deemed consistent with objective standards if written notice with specific explanation is omitted within 60 days.

Clock #07 · Entitlement & Streamlining30 Calendar Days (Calendar Days)

PSA Decision Clock — PRC § 21080.66 Urban Infill Housing

Gov. Code § 65950(a)(7) · Pub. Res. Code § 21080.66 · Trigger: Lead agency determination that <=20-acre urban housing project is exempt under PRC § 21080.66

AB 130 fast-track: requires Phase I ESA and tribal cultural consultation clearance; <=4-acre limit on Builder’s Remedy projects.

Clock #08 · Entitlement & Streamlining60 Calendar Days (Calendar Days)

PSA Decision Clock — CEQA Exempt, Ministerial, ND/MND, or >=49% Affordable EIR

Gov. Code § 65950(a)(3)–(6) · Trigger: Exemption determination, ND/MND adoption, or qualifying affordable-housing EIR certification

Separates CEQA determination/adoption date from final project approval decision clock.

Clock #09 · Entitlement & Streamlining90 Calendar Days (Calendar Days)

PSA Decision Clock — Housing Development EIR

Gov. Code § 65950(a)(2) · Trigger: Certification of EIR for a housing development project

Half the 180-day non-housing EIR clock; track one-time 90-day extension consent rules carefully.

Clock #10 · Entitlement & Streamlining180 Calendar Days (Calendar Days)

PSA Decision Clock — Non-Housing EIR

Gov. Code § 65950(a)(1) · Trigger: Certification of EIR for a non-housing development project

Baseline Permit Streamlining Act ceiling for commercial, industrial, and non-residential projects.

Clock #11 · Subdivision & Vesting Clocks60 Calendar Days (Calendar Days)

SB 684 / SB 1123 Ministerial 10-Lot Starter-Home Map Clock

Gov. Code §§ 66499.41, 65852.28 (SB 1090 / SB 1116 / AB 2601) · Trigger: Receipt of completed <=10-lot starter-home parcel/tract map or housing application

Deemed approved if agency fails to approve or deny within 60 days; 5–10 residential units still require DRE Public Report.

Clock #12 · Judicial Finality & Protest Bars30 Calendar Days (Calendar Days)

CEQA Notice of Determination (NOD) Challenge Window

Pub. Res. Code §§ 21152(a), (c), 21167(b), (c), (e) · Trigger: Compliant filing and 30-day posting of NOD (county clerk + State Clearinghouse CEQAnet)

Premature filing before approval, missing CDFW fee receipt, or truncated posting expands exposure to 180 days.

Clock #13 · Judicial Finality & Protest Bars35 Calendar Days (Calendar Days)

CEQA Notice of Exemption (NOE) Challenge Window

Pub. Res. Code §§ 21152(b), (c), 21167(d) · Trigger: Post-approval filing and posting of compliant Notice of Exemption

Filing an NOE is optional, but omitting it leaves a 180-day CEQA challenge window open across acquisition closing.

Clock #14 · Judicial Finality & Protest Bars180 Calendar Days (Calendar Days)

CEQA Fallback Limitations Window (No Valid NOD/NOE)

Pub. Res. Code § 21167(a), (d) · Trigger: Agency approval decision (or project commencement if undertaken without formal decision)

Governs whenever an NOE is omitted or an NOD/NOE is defectively filed or prematurely recorded.

Clock #15 · Judicial Finality & Protest Bars90 Calendar Days (Calendar Days)

Subdivision Map Act Dual Filing & Service Bar

Gov. Code § 66499.37 · Trigger: Date of advisory agency, appeal board, or legislative body subdivision decision

Action must be BOTH commenced AND summons served within 90 days; runs from decision date regardless of CEQA NOD.

Clock #16 · Judicial Finality & Protest Bars90 Calendar Days (Calendar Days)

Planning & Zoning Law Filing & Service Bar

Gov. Code § 65009(c)(1) · Trigger: Legislative body decision on general/specific plan, zoning, CUP, variance, or DA

Strict 90-day commencement + service bar (note separate 1-year rule under § 65009(d) for certain affordable-housing actions).

Clock #17 · Judicial Finality & Protest Bars90 Calendar Days (Calendar Days)

Mitigation Fee Act Written Protest & Tender Window

Gov. Code § 66020(d)(1) · Trigger: Approval or imposition of development fees, dedications, reservations, or exactions

Requires written protest stating factual/legal basis plus payment or satisfactory payment arrangement under protest.

Clock #18 · Judicial Finality & Protest Bars180 Calendar Days (Calendar Days)

Mitigation Fee Act Judicial Challenge Window

Gov. Code § 66020(d)(2) · Trigger: Delivery of agency’s written § 66020(d)(1) notice stating fee amount and 90-day protest period

Distinct from the 90-day imposition protest date; omitting the § 66020(d)(1) agency notice prevents the 180-day bar from starting.

Clock #19 · Subdivision & Vesting Clocks48m + <=36m Local (Calendar Months / Years)

Tentative Tract Map Initial Expiration (SB 1169 Transition)

Gov. Code § 66452.6(a)(1)(A)–(B) (Stats. 2026, ch. 423) · Trigger: Approval or conditional approval (if unexpired as of Dec. 31, 2026)

Expands pre-2027 24m + <=24m tract terms statewide (including charter cities), but does NOT revive maps expired before Dec. 31, 2026.

Clock #20 · Subdivision & Vesting Clocks24m + <=12m Local (Calendar Months / Years)

Tentative Parcel Map Initial Expiration

Gov. Code § 66463.5(a) · Trigger: Approval or conditional approval of tentative parcel map

Not amended by SB 1169! Parcel maps retain 24-month statutory base and 12-month local-ordinance ceiling.

Clock #21 · Subdivision & Vesting Clocks<=72 Months + 60d Bridge (Calendar Months / Years)

Discretionary Map Extensions, 60-Day Bridge & 15-Day Appeal

Gov. Code §§ 66452.6(e), 66463.5(c) · Trigger: Timely extension application filed BEFORE map expiration

Aggregate 6-year discretionary cap; automatic 60-day bridge pending decision; 15-day legislative appeal if denied.

Clock #22 · Subdivision & Vesting Clocks12–24m + Tolling >30d + 12m Ext (Calendar Months / Years)

Post-Recordation Vesting Tentative Map Rights

Gov. Code § 66498.5(b)–(d) · Trigger: Recording of Final Map (or each phased Final Map) on a VTM

Automatically extends by agency days >30 spent processing complete grading or design review; complete building permit locks rights.

Clock #23 · Post-Entitlement Permits15 Business Days (Business Days)

Post-Entitlement Housing Permit Completeness Clock

Gov. Code § 65913.3(a)(1) (AB 2234 / AB 1621) · Trigger: Submittal of housing building, grading, or demolition permit application

Deemed complete if agency misses 15-business-day written notice tied to published checklist.

Clock #24 · Post-Entitlement Permits30 BD (<=25u) / 60 BD (>=26u) (Business Days)

Post-Entitlement Housing Plan-Check Review Clock

Gov. Code § 65913.3(a)(2) (AB 2234 / AB 301 / AB 1621) · Trigger: Complete housing post-entitlement phase permit application

Unlawful delay triggers HAA violation exposure under § 65589.5 unless timely outside-agency / safety exception findings apply.

Clock #25 · DRE & CID Turnover10d -> 60d/20d -> 30d/20d -> 15d/10d (Calendar Days)

DRE Public Report Statutory Review Sequence

Bus. & Prof. Code § 11010.2(b)–(d), (g) · Trigger: Receipt of DRE Notice of Intention & Public Report application

CIDs (§ 11004.5) run 10d quant / 60d qual / 30d resub / 15d issue (15/90/30/30d under § 11010.2(g) emergency surge).

Clock #26 · DRE & CID Turnover6m (+6m) or 30m (+6m) (Calendar Months / Years)

DRE Conditional Public Report Term

Bus. & Prof. Code § 11018.12(h)–(i) · Trigger: Issuance of Conditional Public Report under § 11018.12

30-month initial term requires 25+ attached residential condominiums (Civ. Code § 783); no escrow closing until Final Report issues.

Clock #27 · DRE & CID Turnover180 Calendar Days (Calendar Days)

Calderon Mandatory Pre-Litigation CID Defect Process

Civ. Code § 6000 · Trigger: Service of written Notice of Commencement of Legal Proceedings by HOA (20+ units)

60d builder document production + 180d inspection/mediation sequence; coordinate strictly with Title 7 (§§ 910–938) agent designations.

Clock #28 · DRE & CID TurnoverEvery 9 Years (15d Safety Report) (Calendar Months / Years)

Condominium Exterior Elevated Element (Balcony) Inspection

Civ. Code § 5551 · Trigger: Condominium buildings with 3+ multifamily units and wood-based elevated elements >6 ft

Licensed architect/structural engineer inspection; retain 2 cycles (18 yrs); immediate safety threats reported to local enforcement within 15 days.

Full 2025–2026 Legislative Session Audit Scope

All 1,263 Chaptered 2026 Bills Screened Against Official Primary Text

All 1,263 chaptered 2026 California statutes were screened directly against the Legislature’s official statutory database across the Government Code, Business & Professions Code, Civil Code, Public Resources Code, and Water Code—verifying exact operative dates, geographic sunset boundaries (such as AB 2692’s Los Angeles County scope and January 1, 2028 repeal under Civ. Code § 4276(f)–(g)), and cross-plane interactions with DRE Title 10 CCR and CEQA Title 14 CCR regulations.